- Published amount or program scope
- $57,300–$115,000
- Historical term
- 84 months
- Support status
- Published project support

The equipment need
A company wanted to install an 80 kWp rooftop solar array on its headquarters to consume the power on site and lower its energy bill.
It wanted a 6- to 7-year term so that lease payments would stay in line with the savings it expected.
- Solar panels
- Inverters
- Roof mounting system
The support described in the project
Leaseworld arranged an 84-month equipment lease with a purchase option covering the complete solar installation.
The monthly payment was sized to stay consistent with the projected savings from self-consumption.
The reported operational outcome
The company reduced its dependence on purchased power while spreading the investment over the system's production period.
Applying the experience to a new project
Use this case to identify the equipment, timing and ownership questions relevant to your own investment. The historical scope and term are specific to the project described. For a new U.S. project, identify the contracting business, installation state, supplier quote and preferred use period; available structures require a separate assessment.
About this case study
Published 2026-09-19 by the Leaseworld editorial team. Identifying details are withheld. Historical budgets and requested terms do not establish eligibility or an offer for another applicant.
Amounts shown in U.S. dollars are rounded equivalents for comparison using a reference rate dated September 18, 2026. They are not current equipment prices or financing offers. The original project agreement determines its legal, tax and accounting treatment.