The equipment need
A company developing new materials from recycled materials had to equip itself with a CNC machine to manufacture its products.
The challenge was to increase project delivery capacity while controlling investment.
- CNC Machine
The support described in the project
We have put in place an equipment lease covering the entire cost of the machine.
The financing structure allowed for a rapid start to production.
The reported operational outcome
The company was able to manufacture its materials and honour an increased number of projects.
The funding supported its circular economy approach without increasing its liquidity.
Applying the experience to a new project
Use this case to identify the equipment, timing and ownership questions relevant to your own investment. The historical scope and term are specific to the project described. For a new U.S. project, identify the contracting business, installation state, supplier quote and preferred use period; available structures require a separate assessment.