- Published amount or program scope
- $57,300–$115,000
- Historical term
- 60 months
- Support status
- Published project support

The equipment need
The manufacturer designed and marketed whole body cryotherapy machines for demanding professionals.
Its clientele included medical facilities, high-level sports centers, wellness facilities and high-end hotel facilities.
The purchase price of a cabin was a brake on decision-making for structures whose liquidity remained tense.
The company was looking for a partner capable of offering leasing directly at the time of sale.
- Entire body cryotherapy cabin
- Cold unit and cooling circuit
- Pilotage and safety system
- Installation and commissioning
The support described in the project
We have put in place a leasing offer over 60 months, adapted to the actual duration of use of the equipment.
We have integrated the machine, its cold unit, the steering system as well as the installation and commissioning.
We have built two separate rental payment grids, one for medical and sports facilities and the other for welfare and hotel operators.
We have a purchase option at the end of the contract, allowing the end customer to keep the equipment with a reduced residual value.
We examined each file within a short period of time so as not to delay installation schedules.
The reported operational outcome
The manufacturer has a presentable financing solution from the first commercial appointment.
Final customers spread their investment over the life of the cab rather than leverage their liquidity.
Leasing preserves the bank credit lines of the structures financed for their other projects.
The offer covers all segments addressed by the manufacturer, from the medical office to the hotel establishment.
Applying the experience to a new project
Use this case to identify the equipment, timing and ownership questions relevant to your own investment. The historical scope and term are specific to the project described. For a new U.S. project, identify the contracting business, installation state, supplier quote and preferred use period; available structures require a separate assessment.
About this case study
Published September 19, 2026 by the Leaseworld editorial team. Identifying details are withheld. Historical budgets and requested terms do not establish eligibility or an offer for another applicant.
Amounts shown in U.S. dollars are rounded equivalents for comparison using a reference rate dated September 18, 2026. They are not current equipment prices or financing offers. The original project agreement determines its legal, tax and accounting treatment.



