The equipment project
A hotel asked Leaseworld for help financing the installation of a heat pump to replace its heating system.
The supplier quote covered both the equipment and its installation.
The operator wanted a lease so that it would not have to pay for the full investment up front.
- Heat pump
- Supply and installation
The support described in the project record
Leaseworld reviewed the quote and the hotel's situation to identify a suitable structure.
The record describes an equipment lease with a purchase option that brought the equipment and the installation costs into a single financed amount.
Payments were spread over a term consistent with the expected service life of the equipment; the record does not publish a fixed number of months.
The reported outcome
According to the project record, the investment became regular payments and the hotel preserved its cash.
The hotel could modernize its heating without first setting aside the down payment a purchase would have required.
The expected energy savings were set against the payments; the record does not report measured savings.
Planning a comparable project
Ask the installer to list the outdoor and indoor units, electrical work, controls and commissioning on separate lines, and to confirm which refrigerant the system uses and the rules that apply on the planned installation date.
Say whether the business owns the building or leases it, and for how long, since a heat pump is fixed to the property.
Projected energy savings are an assumption to document, not a guarantee that they will cover the payments; the financing partner assesses the business that signs, not only the equipment.