- Published amount or program scope
- $115,000–$229,000
- Historical term
- 60 months
- Support status
- Published project support

The equipment need
The operator of an office building dedicated to coworking was to replace an aging air conditioning system which had become insufficient for the comfort of the occupants.
The renewal of a facility of this magnitude represented a one-time expenditure on the structure's own funds.
Management wanted to spread the cost over the actual life of the equipment rather than leverage its operating cash.
The schedule of work required securing funding prior to the purchase of the orders from the installer.
- Ice Water Production Group
- Reversible indoor units of air conditioning
- Air distribution network
- Centralised regulation and control
The support described in the project
We have structured an equipment lease covering the entire air conditioning facility, including cold production and distribution.
The duration has been set at 60 months to align lease payments with the expected operating time of the equipment.
The funding structure has integrated the installation and commissioning services into all the costs financed, in order to avoid any immediate burden.
We cordoned the release of the funds with the installer's schedule so that the work would start without any cash advance.
The reported operational outcome
The building was equipped with a new facility without capital capital.
The restored thermal comfort has secured the satisfaction of the occupants and the commercial attractiveness of the spaces.
Preserved liquidity remained available for other site development posts.
Applying the experience to a new project
Use this case to identify the equipment, timing and ownership questions relevant to your own investment. The historical scope and term are specific to the project described. For a new U.S. project, identify the contracting business, installation state, supplier quote and preferred use period; available structures require a separate assessment.
About this case study
Published September 19, 2026 by the Leaseworld editorial team. Identifying details are withheld. Historical budgets and requested terms do not establish eligibility or an offer for another applicant.
Amounts shown in U.S. dollars are rounded equivalents for comparison using a reference rate dated September 18, 2026. They are not current equipment prices or financing offers. The original project agreement determines its legal, tax and accounting treatment.