The equipment need
A restaurateur was preparing the opening of his establishment for the re-entry and had a full estimate for the equipment of his kitchen.
It wished to finance the entire estimate without using the necessary liquidity for the first months of operation.
The opening schedule required a quick response in order to secure the order from the supplier.
- Professional ovens
- Cooking plan
- Professional cold
- Laundry and stainless steel
The support described in the project
We have structured an equipment lease covering the entire estimate, on a duration aligned with the economic life of the materials.
The case was investigated within a few days by a lessor specializing in restoration.
The lease payments were aligned according to the institution's forecast of activity.
The reported operational outcome
The supplier was paid directly by the lessor and the equipment was delivered before the opening.
Applying the experience to a new project
Use this case to identify the equipment, timing and ownership questions relevant to your own investment. The historical scope and term are specific to the project described. For a new U.S. project, identify the contracting business, installation state, supplier quote and preferred use period; available structures require a separate assessment.